Social Housing PPP Programme, Phase 2

Size152 units across 3 sites.
Year Constructed2022
ArchitectSimon J Kelly Architects
Design Features
  • 2 – 4  bedroom terraced townhouses.
  • A rated – sustainable social housing.
Timber Frame Features
  • Cygnum designed, supplied, and installed these exceptional A-rated houses to achieve low energy requirements.
  • We achieved between 1 & 2 air changes per hour @50 Pascal’s pressure.
  • The construction of these houses incorporated Cygnums Reflect 200 wall system which includes factory-fitted insulation, airtight layer, and service cavity battens.
  • The roof construction included 400mm of insulation, an airtight layer, and service cavity battens to the ceilings.